Here are some tips for installing and configuring large projects with 100+ lights:
Planning:
*Divide the installation area into smaller sections based on room layout and lighting design. Keep each section under 100 lights.
*Plan lighting circuits based on load capacities and room divisions. Lights on the same circuit should be in the same section. Large sections can have multiple circuits.
Installation:
*Turn-on power separately to each circuit as you commission. This simplifies the commissioning process..
*Only power on one section at a time when configuring in the app. Complete all programming for that section before moving to the next. Avoid powering everything on at once.
*Use the “Sort by Signal” option when adding lights. This arranges them by distance to your mobile device, which helps locating.
*Create the necessary zones, groups, scenes, etc. in the app ahead of time to save on-site time.
*Name everything logically based on room names/numbers to keep organized.
By dividing into smaller sections, configuring one section at a time, and planning ahead in the app, installing large projects with hundreds of lights is manageable. Just take it one step at a time.